Member of Sara Elgi  Group

This Product is manufacturing with german Technology


ELGI ELECTRIC with over 3 decades ofexperience in Textile Engineering and renownedfor offering innovative and world class productsbring you the state-of-the-art Bobbin TransportSystem (BTS).

The Bobbin Transport system provides economicadvantage to package handling in Ring spinning.It ensures the protection of Roving wound aroundthe Bobbin, which is highly liable to damagesduring manual transportation BTS also protectsthe Yarn where the Roving defectsaretransferred.

Bobbin Transportation System is certainly thearea in Spinning Mill where the investment inAutomation is more easily justified due to laboursavings and reduction in damages to yarn.Especially in the coarser count spun the savingwill be higher.


BTS Advantages
Can be installed in the existing layout
(both Building and Machinery)
Interface any roving and ring frame.
Contact less Bobbin Transport.
No Mix-up of yarn counts.
Technology Up gradation.
Man Power Reduction.
Features
Constant Production for long duration time.
Advantage of extremely simple system forbobbin transporting.
Full digital control
Suitable for fine and medium counts.
Light weight (24 kgs or 53 Lbs) - suspends on non-metallic duct without need for bulky floor support
Types
Manual Bobbin Transporting System
Closed Loop Bobbin Transporting System
Automatic Block Creeling Type System


AUTOMATIC STORAGE TYPE BOBBIN TRANSPORTING SYSTEM

The train of bobbins are automatically transported from speed frame tothe storage area and respective ring frame by selecting the appropriate program in the PLC. Empty bobbins in the ring frame aremanually interchanged with full bobbins from BTS by tte operator and empty bobbins are Transported back to speed frame automatically


GENERAL TECHNICAL DETAILS
Total Length = L = Unlimited
Transport Speed = V = Upto 16 meter per minute.
Pitch of the bobbin = P = 150 mm to 210 mm ( varies depends
on bobbin wound diameter & types)
Bobbin Exchanger pitch = PE = 660 mm.

AUTOMATIC CLOSED LOOP BOBBIN TRANSPORTING SYSTEM

Bobbins are transported by end - less (CLOSED LOOP) railingsystem, which is routed between ring frames and eventually interface to the flyer via bobbin exchanger that feeds the full bobbins. An endless train is continuously running around the spinning frame. Inthis method, the trains will move slowly through the railing and the empty bobbins is changed with full bobbin in the ring frame creelrandomly wherever/whenever required.

 
Copyright © 2005 - Elgi Electric And Industrial Limited. Site Design - ANGLER Technologies